

Stars Over the River Drin
10.0197869m
Drama
After the foreign specialists leave, engineer Lulëzim is left in charge of building the Fierza Hydroelectric Power Station.
VURA is now in beta testing.
Report bugs, broken playback, or feedback and help us sharpen the experience.
Happy watching — from the VURA development team.


After the foreign specialists leave, engineer Lulëzim is left in charge of building the Fierza Hydroelectric Power Station.